中文

Vertical Transportation Consultant

About us

Comprehensive Testing

Comprehensive Testing is conducted on newly installed facade access equipment to verify the design and operation are as per the specification, prior to handover to the client.

Read more

48 Test

The safety and satisfaction of our clients is paramount at D2E. This is why we created the 48 hour run test. As part of this test, stringent checks are completed over the entire installation to ensure the finish is of the highest standard.

Read more

Supply Chain

We use our extensive industry experience and the successful working relationships we have with key vertical transportation contractors to ensure that our clients are contracted to the most appropriate suppliers for their particular needs.

Read more

Cleaning Strategy

A detailed cleaning strategy is carried out as part of the façade access design process; this includes a cleaning time analysis to determine the number and form of the solutions together with a review of any available alternatives.

Read more

Education

D2E’s vision is to be the most knowledgeable consultants in our field.

Read more